New lead flashing fitted along the side elevation, neatly chased into the brickwork and dressed for a secure, watertight finish. The guttering was replaced for uPVC from what was previously cast iron and light repointing carried out where needed, leaving the junction and surrounding brickwork properly protected.
Copyright © 2025 Mansa Construction & Maintenance Limited - All Rights Reserved.
Building Tomorrow, Today